The project aims to carry out comprehensive maintenance of the damaged bathrooms and sanitary facilities in the Al-Yassin building, including replacing the old networks and installing a new sewage and hot water system. The work includes fixing leaks and repairing the structural elements affected by water damage. The project targets the bathrooms on all floors of the building, with a total of 35 bathrooms that have been damaged, losing parts of the sewage and water systems, such as washbasins, toilets, and faucets.
1. Improved quality of medical services across departments facing significant patient demand. 2. Increased facility capacity to accommodate rising patient numbers. 3. Provision of a healthy and comfortable environment for patients and their families, particularly in inpatient and emergency departments. 4. Enhanced operating conditions, positively impacting patient health, especially in isolation rooms. 5. Strengthened community trust in the medical complex, fostering positive interaction with local residents and supporting the sustainability of its services.
350,000 People